Homepage | Set Home | Add to Favorites
Member

Zhengzhou Leabon Import and Export Trading Co., Ltd.


Products
  • No Category
Search
 

Friends links
  • No link

Beneficiation Plant (gold ore, copper ore, Hematite Ore, iron ore, zinc ore) Mining Processing Plant
Click image to view full size image
Product: Views:48Beneficiation Plant (gold ore, copper ore, Hematite Ore, iron ore, zinc ore) Mining Processing Plant 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-07-08 19:59
  Inquiry
Details
Hengxiang Heavy Equipment beneficiation processing equipment get the user's praise by its advanced technology and excellent quality, Lots of Africa mine oweners order the products from our company.
 

Benefication Processing plant


 Four Steps Of Ore Dressing line

Step1:Crushing-- Put the ingredients broken 
1)process introduction: Due to the volume of ore produced is too large , so it is necessary to the mined ore crushing. In this process , send the ore into the crushing device to crushed . In general, The System requirements of the ore particle size for general 12mm------18mm.
2).Main Equipment: Jaw crusher,impact crusher,hammer crusher,cone crusher etc



Step2:Grinding--The processing of raw materials carefully
1) Process introduction: In this process, we must first make clear the requirements for each ore solution particle standards, Based with the aid of various equipment, put all sorts of ore grinding to separation units required unit solution size.
 
2).Main Equipment:Feeder,Ball Mill,Classifier, Overflow ball mill,etc.

 
Step3: Sorting --Select fine ore powder
1).Process introduction: In the production process,not all the ore powder are in line with the standard . we need to filter the ore powder . In this process We use professional equipment to elect qualified concentrate powder from ore , eliminated does not meet the criteria for ore.
2).Main Equipment:Mixing machine ,Flotate separator,magnetic separatoretc.


step4:Dehydration --Take off water in the ore
1).Process introduction: Due to various constraints, after the front of several processes , there are always some residual moisture in the ore powder, then we need to pick out concentrate dehydration, to meet the requirements of transportation and smelting.
 
2.)Main Equipment:Vacuum filter,Box pressure filter,Folding belt filter,Ceramic filter,Vacuum pump, Driving thickener,etc.

We can help you to sort out effective solutions to practical problems for the gold beneficiation line. If you have problems ,please tell us. That's the best choice!!

Model XJK-0.35 (3A) XJK-0.62 (4A) XJK-1.1 (5A) XJK-2.8 (6A) XJK-5.8 (7A)
Volumem3 0.35 0.62 1.1 2.8 5.8
Capacitym3/min -0.4 0.3-0.9 0.6-1.6 1.5-3.5 3-7
Rotation speedr/min 470 400 330 280 240
Impeller diametermm 300 350 500 600 750
Motor Rotor, Scraping plate, Power, Blade motorkw Y90L-4 Y100L2-4 Y132M2-6 Y160L-6 Y200L2-6
(255M-6)
Y90S-4 Y90S-4 Y90S-4 Y90S-4 Y90L-4
1.5 3 5.5 11 22(30)
1.1 1.1 1.1 1.1 1.5
Weightt/single trough 0.43 0.86 1.38 2.33 3.533
Inquiry